Wednesday, March 13, 2013

New Beginnings

We went with Josh and Julie to the final inspection of the interior of the house which just got its certificate of occupancy. Turns out the builder wants them to close ASAP even though there is no porch, yard or front steps. Josh was thinking of closing in a month but no, it will be in less than 2 weeks. Yikes! And the other house needs to be put on the market.
The fireplace works!

View from the family room to the front hall. All the walls are the same yellow but the lighting makes it look like orange here

It will be fun to change this light bulb


The kitchen. Need to get a refridgerator


Soaking tub

2 sinks
S the inside of their new house is finished. We went through testing everything to see what the builder should fix. It has 4 bedrooms, 2.5 baths along with a living and dining room plus a good sized'eat-in' kitchen. What it needs is a patio.

Still don't feel 100% back to normal. Steve is getting me some mushroom barley soup. Maybe I can keep that down.

No comments:

Followers

Blog Archive